Previous procedure
- 1.CIG99412399F0 Outfitting Phase 2 – Specification.
- 2.CIG99412399F0 Outfitting Phase 2 – Special Specifications.
- 3.CIG99412399F0 Outfitting Phase 2 – Technical Specifications.
- 4.CIG99412399F0 Outfitting Phase 2 – TECHNICAL ELEMENTS.
- 5.CIG99412399F0 Outfittings Phase 2 – Annex A (docx)
- 5.CIG99412399F0 Outfittings Phase 2 – Annex A (pdf)
- 6.CIG99412399F0 Outfitting Phase 2 – Annex B
- 7.CIG99412399F0 Outfitting Phase 2 – Attachment C – Economic Bid Outline (pdf)
- 7.CIG99412399F0 Outfitting Phase 2 – Attachment C – Economic Bid Outline (docx)
- 8. Idis Foundation Code of Conduct